I’ve been a bit slack reporting the latest roadworks, but they have done a fair bit of work from when they started after the long weekend to Saturday night, when I’m writing this. For the first few days of this week they were tearing up a section of the road near our place to put some pipes in, and also putting down crusherdust or gravel for the new road down at the big bridge.
For the last few days of the week they then concentrated on the section near our place, which involved filling in part of the creek near the Bungundarra intersection and also dumping over 30 truckloads of rocks and dirt to bring the new road up to the level of the smaller bridge near out place. Photos are below.

The new section of road just up from the big bridge. If you look at previous roadworks posts, you’ll be able to see what this section of road used to look like. On the right you can see a turnoff for cars going to Mt Rae Road.

Looking down onto the big bridge. Now all they have to do is put gravel down on the other side and they are almost finished.

Located just to the right of the smaller bridge near our place, you can see how they’ve filled in a section of the creek. This is to make sure the water goes the alternate route, which is straight under the bridge and road and back into the creek.

The water coming out from the other side of the road. The white posts you see are marking the Telstra fibre optic cable, which runs under the road too. Beats me why we can’t get broadband with a cable (and fibre-optic at that) running right near us.

Finally, this photo taken yesterday (Friday) shows how they’ve filled in up to the level of the bridge. I expect to see this section laid with crusherdust and then tar in the next few weeks.